2019-Oct-12 - Wooroloo - Windows #88
|
My blogs are getting even shorter still - a reflection of my frustration at not being able to complete the front of the house cladding.
This Saturday I installed the last of the front door infills and then moved on to the architraves around the bay windows.
I completed the left hand side bay window by the end of the day
|
 Infills around front door completed |  First set of architraves installed |  All architraves for LHS bay window |