I was out on site at a little after 7.00 am.
It took me about an hour to prepare for installing the second double window.
Ian helped me again - this really saved me a lot of time.
This time I was much faster at centering, leveling and squaring the window and had it fixed in and patched by 10.30 am.
I had originally intended to head home after this and work on preparing the external staff beads.
However, I decided to work on stacking the last pile of maree floorboards.
This took quite a while to prepare - I had to move materials around and do some cleaning up.
Jim and Sandy dropped in in the middle of all this.
By the end of the day I had strapped down the first 3 layers - it is probably best to leave this for a week before strapping any more.
I stacked all the remaining timber on top to aid in the straightening process.
My aim is every week to add the next three layers.