2019-Mar-2 - Wooroloo - Windows #56
I was out on site at a little after 7.00 am.

It took me about an hour to prepare for installing the second double window.

Ian helped me again - this really saved me a lot of time.

This time I was much faster at centering, leveling and squaring the window and had it fixed in and patched by 10.30 am.

I had originally intended to head home after this and work on preparing the external staff beads.

However, I decided to work on stacking the last pile of maree floorboards.

This took quite a while to prepare - I had to move materials around and do some cleaning up.

Jim and Sandy dropped in in the middle of all this.

By the end of the day I had strapped down the first 3 layers - it is probably best to leave this for a week before strapping any more.

I stacked all the remaining timber on top to aid in the straightening process.

My aim is every week to add the next three layers.


Second large window frame installed

Floorboard strapping