During the week I popped out to site to check out the flooding.
With the sump pump back in action, the site was bone dry.
Saturday morning, I awoke to heavy rain.
However, after looking at the Perth Weather Radar I could see that this rain front should pass over in about an hour.
I made my way out to site and initially had to pick my way around avoiding the rain.
After about an hour the weather changed in to 4 hours of blue skies and bright sunshine.
I finished off the gable run from the other week, installed some barge capping and started on the gable covering from the other side.
While I was working on this, an earth moving contractor was busy removing the quarry dust that I do not want - so this was a real bonus.
By the end of the day I was about two thirds of the way down the next part of the gable.