I'm having a week off work at the moment. Friday was fine but Saturday was predicted to rain - so I worked on site today.
I installed the last rafter support frame and another frame at the edge of the wet area.
By the time I had installed all the battens (getting VERY efficient at this) it must have been almost 4.00 pm.
At this point Paul R visited for a short while and we had a coffee together.
Then back on to fixing down the corrugated iron.
I had just enough time to collect a load of rubbish for the tip tomorrow and to take away the tools.
All I have left to do is to install one more rafter run with battens and then I can install the last one and a half sheets.