Not a lot to say really about today.
I had marked up the line last week.
Today I drilled the bracket mounting holes and installed 13 pairs of brackets and the bridging.
I finished by 1.00 pm and then rain forced me into indoor chores at 2.00 pm.
I still need another 300 purlin bolts - I thought I had ordered enough but somewhere I made a mistake in my calculations.
I had hoped to install one run per week but I am not keeping up with that target.
So far three weeks elapsed and only two runs installed.