Contact Us

Home

2016-Aug-6 - Wooroloo - Loft Floor Joists #52
Not a lot to say really about today.

I had marked up the line last week.

Today I drilled the bracket mounting holes and installed 13 pairs of brackets and the bridging.

I finished by 1.00 pm and then rain forced me into indoor chores at 2.00 pm.

I still need another 300 purlin bolts - I thought I had ordered enough but somewhere I made a mistake in my calculations.

I had hoped to install one run per week but I am not keeping up with that target.

So far three weeks elapsed and only two runs installed.


Second run completed