2021-Mar-20 - Wooroloo - Side Wall #18
A bit of a slow start to the day - I did not arrive on site until 10:30 am.

I installed two more rows of planking.

I also prepared the stops for the next two pairs of doors I intend to install.

This involved using a belt sander to take the strips back to raw timber.

They will eventually be primed and enamelled with oil based paints.

Having the stops installed makes the process of installing the doors much easier.

I will do a rough positioning of the doors in readiness for Peter to come and perform his magic


Progress by the end of the day