Contact Us

Home

2014-Jun-7 - Wooroloo - Stud Framing #13
Out on site at 7.00 am, finished at 6.00 pm.

Yay !

I managed to lift the temporary roof, jack a stud frame in to position, fix it off to the previous frame and to the floor and reinstall the roof with cutouts and fillins - all in one day.

Looks like I have finally hit the right rhythm - one weekend creating a stud frame, one weekend installing it.


Lifting with the winch up trolley

Lifting with the sheet lifter

In position and fixed off

Linda was very helpful again