I am managing to get out to site every two days so the events I describe here are mixed in to a bit of a blur.
The painting of the back doors has been nudged along on each visit and I am now at the point of scraping back any overpaint before reinstalling the doors.
The side doors have been taken down again for patching of some minor damage and to add a 15mm expansion strip to one of the doors.
This has been glued on and sanded back flush with the door surface.
So far I have applied a single coat of primer to the extension and will keep nudging this along.