2011-Mar-5 - Wooroloo - Yard #3
I was very tired and didn't get up until 7.00 am and eventually out on site by 9.00 am.

In fact I'm thinking I might take a holdiay away from construction work one weekend soon - I'm getting very stale.

Ross had done a bit more leveling work around the EcoMax system so I laid more slabs up to the main tank.

I also put aside 80 odd slabs and stacked them along the fence line - I will use these later in the workshop so I need to keep them fairly accessible at the moment.

It was very hot outside working on the Boral Quarry dust so I needed to take frequent breaks to rehydrate and cool down. Soon it was 5.30 pm and time to go - I only completed a fraction of the task list in my mind.


Before removing slabs

After

All stacked along the fence line

More quick paving done at the back door