Contact Us

Home

2010-Sep-20 - Wooroloo - Tiling Laundry #20
On Monday (1 hr) and Tuesday (2hr) I drove out to Wooroloo in the mid afternoon and painted the grout sealer on to the larger laundry area.

Very tedious but essential if I don't want to grind stains in to the grout.

I needed this finished so that on Saturday morning I could start placing the second hand kitchen cabinets in to their eventual destinations (probably need a whole day to engineer the kick boards under them).

This is necessary so that the kitchen sink can be plumbed in.

All of this is bringing me one step closer to being able to call Wayne, my plumber to do the final fix.

That will be great - hot water, an inside toilet, a working shower and a complete kitchen.