Peter spent quite some time last week dragging clean fill around in a rubbish bin to backfill the drainage trenches (I forgot to bring the wheel barrow)
After all the pipe laying and trenching in the workshop area - we had quite a pile of dirty soil left over.
This was a mixture of clay lumps and Boral Quarry Dust.
Laurent and Deborah worked through this - sorting it out in to clay and mainly grey fill.
These were then shovelled in to separate heaps.
Finally the workshop area is turning in to a flat, level plot of land.