I set Peter working on fixing off some more of the light angle iron brackets while I inserted a fairly large area of insulation batts.
Then Peter and I worked on cutting gyprock to size and fastening three large sheets to the South East corner of the garage.
I managed to disconnect and refasten the roller door brackets as we worked our way through each of the three sheets