I have already had one quick "go" on this.
There were two places where the electrician told me I needed to screw on the correct saddles rather than using cable ties or allowing the electrical feed to flap in the breeze.
One was the builder's pole at the top of the driveway.
The other was the external GPO on the temporary veranda pole for feeding the sump pump.
I had to nip out to site at 8.30 am on Monday morning - so while I was out there - I did a little bit of work on tidying these up.