The lower sheets installed last week still needed a couple of hours to fix off fully and to create the cut outs for the GPO's.
Following that - the upper sheets were probably the trickiest that we have done so far - 3.6 m long with cut outs for the main beam.
So now the garage completely looks like a room in its own right.
We had just enough time to tack in place the sheets between the laundry and bathroom area.
Kaj back filled the area at the back door with yellow builder's sand so that we could walk over the plumbing safely - makes a big difference.