2022-Jun-18 - Wooroloo - Plumbing #5
Today's project was to remove the floor boards to drop in the fibre cement sheet.

I spent all day on this and have only made two of the cuts.

The cut right next to the existing stud frame was very difficult.

I had to use a combination of : a 12 mm drill, a box saw, a reciprocating saw and a chisel.

I'm hoping to get out on site during the week to make more progress.

This time I will take my power saw for one of the easier, more time consuming cuts.