2009-Dec-27 - Wooroloo - Internal Cladding # 5
We went to site on a Sunday rather than the Saturday as Kaj had a running event organised for Boxing Day.

On the garage creek side wall near the bathroom wall we had a slightly misaligned column (2 years ago we had a lot of trouble when installing this column - we kept hitting reo bar when drilling for the Dyna bolts

The up shot of this is that I had to install some packing either side of it (graduating from 4.5mm to 9 mm)

While I was doing this, Kaj was rust converting the last remaining beam just outside the roller doors.

The rest of the day was pretty much taken up with me installing insulation while Kaj fastened the sheeting.