2009-Dec-12 - Wooroloo - Internal Cladding # 3
We need a particular section of the internal cladding installed so that we can install a second hand Daiken reverse cycle airconditioner that we picked up for a very reasonable sum.

Last week we had already installed insulation at the first level of the wall - so this piece was installed quickly.

The other pieces were quite fiddly to cut, fit and fix off with some pieces being very heavy.

This took us most of the day and we were very tired by the time we finished.

More work will be required on this section of wall next week. Aditional fixing and the cut outs for the GPOs still need to be done.