The electricians have completed enough of the first fit that we can now contemplate installing the internal lining.
We had reached 5.00 pm and were wondering if we would be able to install the two panels needed for the air conditioner to be installed.
The first step was to install insulation.
After that, I decided that we had no chance of getting both installed by the end of day - so decided to pack up early.