As soon as we arrived I set Linda to painting the large central beam with Kill Rust Mission Brown
Meanwhile I glued and screwed the upright panels that had been tacked in last week.
After that, I floated the joints and dressed the inside edge of both doors with some custom ordered flashing.
Linda did a great job inserting nylon protective bushes in all the 25mm holes I drilled several months ago ready for cable pulling.
She also rust converted some 75mm SHS I am planning to use to knock an extra doorway from the laundry area in to the void area.