On Wednesday, I brought home from Tony M 280m of floorboards he had cleaned for me.
Saturday, I dismantled 4 pallets to give me the last of the timbers required for the temporary roofing frames.
Sunday, I end matched the last of the floorboards ready for installation on Easter weekend.
This lot was a bit of a pain - the tongue section ended up with a 1 mm feather at the bottom edge which required a second pass through the router to clean it up.
In theory - this is the last of the end matching.
For the loft flooring I intend to attach timber battens to the sides of the z purlins and use a brad nailer.