Worked all Saturday and Sunday
Managed to lay another 2 metres of floor.
Done 5.1 metres total so far - not even halfway there (total of 12.6m) - will this job ever end ?
At least I'm past the large structural beam in the carport area and just about up to the stairwell beam in the laundry area.
Almost time to lay another 3 sets of roofing frames - the black plastic is barely covering the floorboards at the moment.