To lay the floor boards on to the top of the undercroft we need easy access - we will have to drag a lot of floorboards and wood working machines on to the surface.
The front 3m veranda has not yet been installed so I constructed a bridge to get us up there from off the front street level
This will make life a lot easier for Tony M (with his bung ankle) and for me (to bring up materials)
I bought two patio trusses from the local tip at $15 each, repaired some rusted steel, and welded on bed frame angle iron - to create a strong sturdy walk way