2008-Jun-28 - Wooroloo - Installing Purlins weekend #7
Last two plain purlins over the garage area plus the second tricky purlin over the PFC with the interruptions from the columns above sockets

Then finished off all outstanding bolting at the very front cleats (photos taken before bolting finished)

Organised with Ross to install sockets on extreme LHS and RHS of back wall so that on main level can fit a "curtain wall" ( ie door and window spaces do not need to take structural loads).

Will be able to install columns with PFC header at 0m, 4m, 6m and 10m (after discussions with Patrick the Structural Engineer)