2007-Mar-24 - Wooroloo - Earthworks - major level changes
|
This involved some major work - scraping top soil out of bog area, moving a large amount of fill from back area of block to front.
|
 Scraping off the top soil |  Scraping off the top soil |  Scraping off the top soil |
 Topsoil piled up to one side |  The cleaned up area |  Taking sand filll from the back of the block |
 to the front |  Building driveway & house pad over the clearing |  The house pad |