Contact Us

Home

2007-Jul-15 - Wooroloo - Screw Piles - 2nd attempt
Analysis of the borehole probe data indicated the presence of of fine clay, changing to sand at 4.1 metres.

It was decided to use extension shafts on some of the screw piles - the required torques were then achieved


Shaft Extensions arriving

Unloading extensions

Top of screw pile in trench

Refusal on screw piles in trench

Refusal on tank slab, main slab