I had arranged for Rick to fabricate the steel frames for the undercroft.
Rick had only a few very specific weekends on which he could work - culminating on a 6.00 am meeting on 4th October because he had a party to go to in the morning.
This means that we had enormous pressure on to finish all the columns by the end of 3rd October
We drove poor Tony M very hard, even with his sore back, to fabricate all the columns by Friday evening 2nd October
Saturday morning, we were absolutely flat out getting all the remaining 9 columns installed
Did not worry about packing them to vertical at this stage - just wanted them all in so that Rick could accurately measure the "as installed" sizes required for the steel framing.