Contact Us

Home

2008-Mar-21 - Wooroloo - Welding columns to screw piles
Needed to weld columns to the 4 screw piles

One screw pile was 100 mm out of position but eventually welded in a gusset and OK'ed by Patrick, the structural engineer

Rained on second day - rigged up a canvas to keep all the tools dry


Gusset fitted

Fix for screw pile 100mm out of position

Heights from screw piles or tank slabs