This was a repeat of last week.
However this time the installation went much more quickly.
I had to spend the first hour of the day loading up the frame and insert (to avoid overnight rain).
Once out on site though, Ian very helpfully assisted me in offloading and offering up the frame to the rough opening.
This led to me finishing the setup and fix off by the end of the day