Sunday
We need to make the approaches to the front door safe for the delivery of the gyprock.
I lifted most of the corrugated iron on the front veranda and laid 3 sheets of 12 mm marine ply.
Then fitted the corrugated iron back on both sides plus strips of 35 x 90 mm to protect against the sharp edges.
Hard work on a hot day.