The first job this morning was to run the lawn mower over the re-arisen weeds.
I'm going to do a section each week.
This time it was the very front "lawn".
Next I continued on with connecting the toilet exhaust fan to the outside world.
This involved connecting a second length of ducting on to the first piece and drilling a circle through the outside wall cladding.
Jim stood at the bottom of the telescopic ladder to watch over me as I pressed the external port in to the wall.